Mission Glass
Tumwater, WA 98501
Featured Project Return to Projects List
BITP Primary Sedimentation Basins - Olympia
Project Information
- Project Location:
- WA
- Status:
- Completed - Jun 2013
- Structure Type:
- Misc Project
References
- Owner:
- Washington State Department of Ecology
- Architect:
- HDR Engineering, Inc
- General Contractor:
- Mortenson Construction
Scope Of Work
This project involves the construction of two new primary sedimentation basins built on the existing 14-acre Budd Inlet Treatment Plant site. Due to the close proximity to the adjacent Hands on Children's Museum, neighboring businesses, and residential areas, the facilities were designed with attractive frontage along Jefferson Street. Part of this frontage includes the installation of Kawneer 451T center glazed storefronts with PPG's Solarban 60 on Solargray tinted glazing. This new facility will bring a much needed face-lift to the treatment facility while helping to ensure our wastewater can be returned to the environment without adverse ecological impact. We look forward to working in our hometown and having our installation be a lasting part of the revitalized downtown Olympia!